Guide 06 • Power + Air Engineering

Coupled Ashok Leyland DG & Atlas Copco Screw Compressor Sizing

How to prevent busbar voltage collapse, star-delta starting trips, and VSD harmonic clashes when running rotary screw compressors off diesel generators in 48°C ambient sites.

Why Compressor Starting Surge Trips Undersized Diesel Generators

Many quarry crushing yards, stone processing plants, and greenfield factories in Jodhpur, Jalore, and Nagaur run electric Atlas Copco G Series / GA / GA VSD⁺ rotary screw compressors directly from an Ashok Leyland PSB : Leypower prime diesel generator before grid HT feeders are commissioned—or during peak afternoon voltage drops.

Matching compressor kW strictly 1:1 to generator kWe causes nuisance tripping within minutes:

  1. Star-Delta / Direct-On-Line (DOL) Starting Surge: A fixed-speed 37 kW (50 HP) induction motor draws 2.5× to 3.2× locked-rotor current for 4–8 seconds under star-delta starting, pulling alternator busbar voltage down below contactor holding thresholds.
  2. Thar Summer Thermal Derating: At 45–50°C ambient tin-shed temperatures, both the diesel prime mover and screw oil circuit experience lower air density and higher heat rejection stress.

Verified Field Pairing Benchmarks (48°C Ambient)

Compressor Package Drive Type Running Shaft Load Recommended Leypower Rating Key Sizing Margin
GA 22 / G 22 (30 HP) Fixed Star-Delta ~22 kWe LP75/82.5 kVA Absorbs star-delta transition + plant lighting
GA 37 VSD⁺ (50 HP) Inverter Soft-Start ~37 kWe max LP82.5 / LP100 kVA Soft-start eliminates spike; size for VSD headroom
GA 55 VSD⁺ + FX Dryer Inverter Soft-Start ~55 kWe max LP125 / LP160 kVA Supports dryer compressor fan & plant auxiliary load
Multi-Unit Quarry Crushing Bench Sync / Mixed Motors 160–240 kWe 2×LP250 Sync Station Auto load-sharing or staggered compressor sequencing

3 Rules Apex Engineering Verifies Before Recommending a Pair

  1. Separate Dryer & Auxiliary Startup Sequence: Delay FX refrigerated dryer and receiver solenoid activation by 15–20 seconds after DG transfer switch stabilizes at 50Hz.
  2. Enforce Exhaust & Clean-Air Ducting: Hot generator radiator air must never short-circuit directly into the compressor intake grill; keep canopy intake clearance ≥ 1.5 meters clear of masonry walls.
  3. Use Our Live Plant Simulator First: Test your real site load %, Thar desert temperature (25°C–50°C), and shift profile directly on our Coupled Power & Compressed Air Sizer before finalizing a proforma quotation.

All system specifications and GST billing are issued under M/s. Apex Engineering (GSTIN: 08BIFPK1646G1ZC). Direct phone & WhatsApp engineering desk: +91 89684 34360.

Direct Engineering Desk • Same-Day GST Quote

Request Sizing Check & Official Quotation

Share your site district, CFM/Bar air demand, kVA load, or part number. Receive direct engineering support and commercial pricing from Mr. Sumit Kumar at Jodhpur HQ.

Direct Phone Hotline+91 89684 34360
Call Desk →
Official RFQ Email[email protected]
Email RFQ →
Registered Commercial Identity
Plot No. 35, 36, Vaishali Shilpgram Pal Yojna, Pal Gaon, Jodhpur, Rajasthan - 342014
GSTIN: 08BIFPK1646G1ZCVendor KYC PDF →
Call HQWhatsAppRequest Quote