Coupled Ashok Leyland DG & Atlas Copco Screw Compressor Sizing
How to prevent busbar voltage collapse, star-delta starting trips, and VSD harmonic clashes when running rotary screw compressors off diesel generators in 48°C ambient sites.
Why Compressor Starting Surge Trips Undersized Diesel Generators
Many quarry crushing yards, stone processing plants, and greenfield factories in Jodhpur, Jalore, and Nagaur run electric Atlas Copco G Series / GA / GA VSD⁺ rotary screw compressors directly from an Ashok Leyland PSB : Leypower prime diesel generator before grid HT feeders are commissioned—or during peak afternoon voltage drops.
Matching compressor kW strictly 1:1 to generator kWe causes nuisance tripping within minutes:
- Star-Delta / Direct-On-Line (DOL) Starting Surge: A fixed-speed 37 kW (50 HP) induction motor draws 2.5× to 3.2× locked-rotor current for 4–8 seconds under star-delta starting, pulling alternator busbar voltage down below contactor holding thresholds.
- Thar Summer Thermal Derating: At 45–50°C ambient tin-shed temperatures, both the diesel prime mover and screw oil circuit experience lower air density and higher heat rejection stress.
Verified Field Pairing Benchmarks (48°C Ambient)
| Compressor Package | Drive Type | Running Shaft Load | Recommended Leypower Rating | Key Sizing Margin |
|---|---|---|---|---|
| GA 22 / G 22 (30 HP) | Fixed Star-Delta | ~22 kWe | LP75/82.5 kVA | Absorbs star-delta transition + plant lighting |
| GA 37 VSD⁺ (50 HP) | Inverter Soft-Start | ~37 kWe max | LP82.5 / LP100 kVA | Soft-start eliminates spike; size for VSD headroom |
| GA 55 VSD⁺ + FX Dryer | Inverter Soft-Start | ~55 kWe max | LP125 / LP160 kVA | Supports dryer compressor fan & plant auxiliary load |
| Multi-Unit Quarry Crushing Bench | Sync / Mixed Motors | 160–240 kWe | 2×LP250 Sync Station | Auto load-sharing or staggered compressor sequencing |
3 Rules Apex Engineering Verifies Before Recommending a Pair
- Separate Dryer & Auxiliary Startup Sequence: Delay FX refrigerated dryer and receiver solenoid activation by 15–20 seconds after DG transfer switch stabilizes at 50Hz.
- Enforce Exhaust & Clean-Air Ducting: Hot generator radiator air must never short-circuit directly into the compressor intake grill; keep canopy intake clearance ≥ 1.5 meters clear of masonry walls.
- Use Our Live Plant Simulator First: Test your real site load %, Thar desert temperature (
25°C–50°C), and shift profile directly on our Coupled Power & Compressed Air Sizer before finalizing a proforma quotation.
All system specifications and GST billing are issued under M/s. Apex Engineering (GSTIN: 08BIFPK1646G1ZC). Direct phone & WhatsApp engineering desk: +91 89684 34360.